Biking the Neuse River Trail – MP 2.75 to 8

IMG_1430On the heels of family visiting at the end of May, my aunt offered to watch the girls while Bill and I headed out for a date night.  Instead of gorging ourselves at a new restaurant, we decided to dust off our bikes and chomp away at another segment of the Neuse River Trail between the Bedford neighborhood and US-401 (followed by beers at a new brewery, Compass Rose Brewery).

For our bike ride we parked in the trail parking lot at 10888 Bedfordtown Dr in the Bedford neighborhood in North Raleigh.  We followed the access road to the trail, turned right to head south, went over a small bridge and then bared to the left to stay on the main trail.  This part of the Neuse River Trail is mostly flat and shaded with several bridges (including covered ones) to pass over and under.  We passed several folks biking and running on the trail and even more folks canoeing and tubing down the river.  Here are a few highlights along our route:

  • IMG_1394milepost 3.5 – look over the river to spot old gas or electricity lines running across an old steel bridge
  • milepost 4.5 – access to oxbow in the river due to years of erosion and sand deposition creating a really sweet swimming hole with sandy beach.  The water flows very slowly in this spot and we saw a few younger kids fishing.  I’d love to bike with the girls down here and bring a picnic and bathing suits.
  • milepost 5 – large bridge access to (presumably future) Wake Forest trails
  • milepost 6.5 – access to WRAL soccer park
  • milepost 7.5 – access to Horseshoe Farm Nature Preserve (still under construction, set to open August 2015)
  • milepost 8 – suspension bridge near US-401

For two people who hadn’t ridden bikes in at least 4 years, this was the perfect ride to ease back into things.  Overall the ride was a little over 11 miles total (out and back) and provided a lot of great scenery and ideas of future outings for swimming, biking and maybe even some tubing!

Thumbs up: access to swimming hole and several parks along the way, relatively flat and shaded trail, variety of water activities available

Thumbs down: nothing to report

Neuse River Trail: MP 7.25 to 9 & Suspension Bridge

IMG_0632Towards the end of March we headed out to Neuse River Trail to explore the area surrounding Horseshoe Farm Nature Preserve, in anticipation of the new park opening sometime this spring/summer.  Using the RGreenway app, we mapped our starting location at the small parking lot at 198 Trailhead Ln outside I-540 and off US-401.  Knowing we wouldn’t pass a playground along our run, we brought the girls’ bikes and scooters to play on after our run.

We walked along the access trail to the main Neuse River Trail and turned left at the compass in the trail to head north towards Horseshoe Farm Nature Preserve.  After crossing over a wooden boardwalk we passed milepost 8 1/2.  The vegetation at this point in the year was very sparse, but showing signs of life to come (you’ll see a remarkable difference in a future Neuse River Trail post that I write).  We stopped every once in awhile to point out interesting things in nature to the girls – a rotting fallen tree, a wicked looking pale-as-a-ghost tree across the river, fallen gumballs, and pigeons resting under underpasses.

After running under US-401 we came to another amazing feat of steel, cables, and pillars – a massive suspension bridge spanning across the river with access to Horseshoe Farm Nature Preserve.  The other suspension bridge I’ve seen along Neuse River Trail is further south at milepost 13.5.  Even though signs indicate the park is closed for construction we looped around and over the bridge for a closer look.  After a short 1/4 mile run we stopped at the “Greenway Closed” signs on the edge of the park and headed back across the bridge and further north along the greenway.  We crossed over some more bridges before turning around near run-down barns around milepost 7 1/4.

IMG_0661This portion of the greenway continues to be relatively flat and shady.  The areas surrounding the greenway are mostly dense forest to one side with the river to the other.  We saw quite a few fisherman on both banks of the river with most of them concentrated in spots near US-401.  Our run back to the car was much faster than the run out so we took advantage of happy little faces and retrieved a balance bike, scooter and helmets from the car and let the girls ride on the greenway.  It wasn’t a busy morning on the trail, so the girls had a carefree time riding.  Ashley biked south on the greenway all the way to milepost 9 where we crossed over a small bridge with a shallow creek below, perfect for spotting turtles.  Claire enjoyed her first scooter ride where we pushed her from behind as she cruised along.  They were troopers for such a long morning run of about 4 miles and then some bike time.

Upcoming event: Celebrate the completion of the Neuse River Trail on Thursday, June 4 at Anderson Point Park with live bands, food trucks, kids’ games and more

Thumbs up: suspension bridge, wide/flat trail, shady

Thumbs down: nothing to report

Neuse River Trail: MP 13.25 to 15 & Suspension Bridge

IMG_7529

While I’ll be at the beach over Labor Day week, I wanted to share a must-do item for exploring Raleigh over the holiday weekend.  If you’re looking for some exercise, flora, fauna and beautiful scenery, this portion of the Neuse River Trail is it – it has a suspension bridge, croaking frogs, majestic herons, and an old dam!

Most recently we explored the Neuse River Trail from milepost 13.25 to 15.  We parked in the small paved residential lot at 2894 Abington Ln in east Raleigh.  After a short run down to the trail, we came to the compass in the greenway and decided to head north for a bit in search of the huge suspension bridge (by looking at the online greenway map, it looks like you cross the river just north of here).   Within 1/4 of mile we came upon the suspension bridge at milepost 13.5, which seems to come out of the middle of nowhere!  It seems so unique and breathtaking to me to have a suspension bridge on the greenway; I’m pretty sure I got goosebumps (granted it was 100+ degrees outside) and felt very sentimental for my city!

IMG_7513

We ran another 1/4 mile north until milepost 13.25 and then turned around and headed south.  We ran back over the suspension bridge where we saw some fisherman casting lines.  Further along we passed residential homes to the west and wetlands to the east with several overpasses in between and white barn fencing in certain areas that gave this trail a farm-like feeling.  There are more stretches of sunny parts along this trail than what I’m used to, I think mostly due to the neighborhood developments; it added some intensity to this hot summer run so don’t forget extra water!

We ran south until the Milburnie Dam, which we have explored in the past.  Again, it’s amazing to see what parts of Raleigh you’ll miss if you don’t get on foot!  So get out and explore this weekend!

More Resources:

Thumbs up: beautiful views, wetlands with information signs, suspension bridge, parking lot with access to trail, mile markers

Thumbs down: nothing to report